Skip to content

AVream Release Candidate Drill

This document defines the RC process before stable release.

RC cadence

  • RC1: feature freeze + install and first-run validation.
  • RC2: bugfix-only + support bundle quality validation.

Exit criteria

  • No open blocker or critical issues on supported platforms.
  • CI matrix green.
  • .deb install + runtime smoke green.
  • User guide and troubleshooting docs updated.

Bug triage SLA (during RC)

  • Blocker: triage same day.
  • Critical: triage within 24h.
  • Major: triage within 48h.

Mandatory manual checks

  • Fresh install and first-run flow.
  • Phone scan, connect, and camera start/stop.
  • Wi-Fi mode setup and connect flow.
  • Android backend start/stop and reconnect controls.
  • Update check and install flow.

Release sign-off

  • Sign-off by maintainer for: UX, packaging, security/polkit, docs.